Hinkley Point B - Inspection ID: 53889

Executive summary

Date(s) of inspection:

December 2025

Aim of inspection

The aim of this inspection was to gain assurance of the approach taken by Hinkley Point B to declare reactor 3 fuel free.

Subject(s) of inspection

  • LC25 - Operational records - Rating: Green

Key findings, inspector's opinions and reasons for judgement made

For this Inspection a number of defuelling quality plans used to evidence defuelling of reactor 3 were sampled and found to have been adequately completed. This was further verified by plant walk down and sampling of physical keys used to lock off each fuel channel.

Conclusion

I was satisfied from the areas sampled that the approach taken by Hinkley Point B to declare reactor 3 fuel free meets the requirement for compliance with LC25 - operational records. I judge that an overall inspection rating of Green (no formal action) is merited.