- Site: Hinkley Point B
- IR number: 20-053
- Date: February 2021
- LC numbers: N/A
Executive summary
Purpose of Intervention
The purpose of this intervention  was to provide regulatory confidence in the management of conventional health  and safety hazards present at EDF Energy Nuclear Generation Limited (NGL)  Hinkley Point B power station (HPB).   Specifically, in relation to the Control of Major Accident Hazards  Regulations 2015 (COMAH).  The  inspection is part of the annual COMAH intervention programme agreed with the  facility. 
The visit was organised and led by the Environment Agency  (EA) as part of the Competent Authority (CA), to assess adequacy of the COMAH  management system, inspect tank storage and containment arrangements including  maintenance management and to close out actions from previous inspections.  The intervention provided a site  familiarisation opportunity for the new ONR COMAH Inspector, alongside  information gathering to enable strategic targeting of future interventions. 
Interventions Carried Out by ONR
A  site inspection was conducted on 24 February 2021, followed by a remote  intervention on 9 March 2021.  Consistent  with internal ONR and EA Coronavirus (COVID-19) arrangements, the two-part  intervention structure was introduced to reduce personal contact time. 
The key regulatory activities undertaken during the two-day inspection to provide regulatory confidence in the application of COMAH are summarised below:
- Review of COMAH management system arrangements, including monitoring and control of dangerous substance inventory.
- Inspect standard of COMAH substance bulk storage at HPB, including examination of tank maintenance regime.
- Verification of progress regarding ongoing tank maintenance and secondary containment improvement actions identified through previous interventions.
- Initiate discussion regarding COMAH status at the end of nuclear power generation, confirming COMAH notification expectations.
Explanation of Judgement if Safety System Not Judged to be Adequate
N/A
Key Findings, Inspector's Opinions and Reasons for Judgements Made
I reviewed the COMAH management system based upon the HPB Major Accident Prevention Policy (MAPP) and I observed detailed arrangements linked directly to achieving COMAH compliance. I judged that HPB demonstrated an understanding of COMAH regulations and the actions necessary to achieve compliance. I was reassured the inventory of COMAH substances was being monitored and managed in line with internal technical specifications and COMAH threshold boundaries. In preparation for the end of power generation there is a need for HPB to clearly define dangerous substance requirements.
To ensure consistent emergency arrangements, the CA recommended the inclusion of a clear link between the MAPP and the Site Emergency Handbook, furthermore, future emergency exercises should encompass response to large a chemical spill.
In the areas sampled, I observed good standards of  tank storage and secondary containment. I determined that COMAH bulk storage  vessels and associated assets are being adequately managed and maintained. I  noted that when issues are identified by HPB, such as engineering defects or  corrosion, corrective action is planned, scheduled and implemented. 
The CA discussed tanker off-loading and I noted that  this activity is being actively monitored by HPB.  I encouraged HPB to continue ongoing efforts  to ensure that tanker off-loading is consistently conducted in compliance with  site instructions. 
The HPB *DSEAR risk assessment is applicable across  the site, however the potential exclusion of the VAB fuel storage tanks may be  a shortfall.  This matter will be  followed up by ONR and resolved with the dutyholder.
My site intervention did not involve specific focus  on Covid 19 arrangements. However, throughout the visit I observed consistent  compliance with hand sanitising, social distancing rules and the wearing of  surgical type face coverings. 
  
*Dangerous  Substances and Explosive Atmospheres Regulations 2002 (DSEAR) 
Conclusion  of Intervention
Good standards were observed during the intervention  in relation to the dangerous substance bulk storage locations inspected. The completion of corrective actions identified during previous  interventions was confirmed. The COMAH management system  arrangements sampled, including dangerous substance inventory controls were  judged to meet COMAH regulatory requirements. In addition, COMAH notification  requirements were clarified by the CA in relation to the end of power  generation.
  
A potential shortfall regarding DSEAR was identified  and this matter will be followed up by ONR as part of the CA and addressed with  HPB through normal business interaction.
  
An inspection rating of Green has been applied to this intervention.