United Kingdom
|
National Totals |
As of 31 December 2022 |
Previous year (2021) |
Rounded to 100 kg plutonium with quantities less than 50 kg reported as such |
Tonnes |
Tonnes |
1. |
Unirradiated separated plutonium in product stores at reprocessing plants |
137 |
137 |
2. |
Unirradiated separated plutonium in the course of manufacture or fabrication and plutonium contained in unirradiated semi-fabricated or unfinished products at fuel or other fabricating plants or elsewhere |
0.4 |
0.4 |
3. |
Plutonium contained in unirradiated MOX fuel or other fabricated products at reactor sites or elsewhere |
2.0 |
2.0 |
4. |
Unirradiated separated plutonium held elsewhere. |
1.1 |
1.2 |
|
Total |
140.8 |
140.6 |
Note: |
As of 31 December 2022 |
Previous year (2021) |
(i) |
Plutonium included in lines 1-4 above belonging to foreign bodies. |
24.1 |
24.1 |
(ii) |
Plutonium in any of the forms in lines 1-4 above held in locations in other countries and therefore not included above |
0.0 |
0.0 |
(iii) |
Plutonium included in lines 1-4 above which is in international shipment prior to its arrival in the recipient State. |
0.0 |
0.0 |
Estimated amounts of plutonium contained in spent civil reactor fuel - United Kingdom
|
National Totals |
As of 31 December 2022 |
Previous year (2021) |
Rounded to 1000 kg plutonium with quantities less than 500 kg reported as such |
Tonnes |
Tonnes |
1. |
Plutonium contained in spent fuel at civil reactor sites |
9 |
8 |
2. |
Plutonium contained in spent fuel at reprocessing plants. |
19 |
18 |
3. |
Plutonium contained in spent fuel held elsewhere. |
Less than 500 kg |
Less than 500 kg |
|
Total |
28 |
27 |
Note
i) The treatment of material sent for direct disposal will need further consideration when specific plans for direct disposal have taken concrete form.
Definitions
- Line 1: Covers estimated amounts of plutonium contained in fuel discharged from civil reactors;
- Line 2: Covers estimated amounts of plutonium contained in fuel received at reprocessing plants but not yet reprocessed.
Annual figures for holdings of civil high enriched uranium (HEU)* - United Kingdom
|
National Totals |
As of 31 December 2022 |
Previous year (2021) |
kg |
kg |
1. |
HEU stored at enrichment plants |
Less than 1kg |
Less than 1kg |
2. |
HEU at fabricating plants or at other reprocessing facilities |
440 |
420 |
3. |
HEU at civil reactor sites |
Less than 1 kg |
Less than 1kg |
4. |
HEU at locations other than civil reactor sites, enrichment fabricating and reprocessing plants (e.g. laboratories, research centres) |
114 |
178 |
5. |
Irradiated HEU at civil reactor sites |
5 |
5 |
6. |
Irradiated HEU at locations other than civil reactor sites |
131 |
132 |
|
Total |
691 |
734 |
*The definition of high enriched uranium (HEU) is uranium enriched to 20% or more in uranium 235
Annual figures for holdings of civil depleted, natural and low enriched uranium (DNLEU) in the nuclear fuel cycle - United Kingdom
National Total |
As of 31 December 2022 |
Previous year (2021) |
Rounded to the nearest 100 Tonnes |
DNLEU |
127979 Tonnes |
122756 Tonnes |